E-flite EFL1275 Manuál s instrukcemi Strana 4

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 17
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 3
EN
Model Assembly
Horizontal Tail Installation
1. Slide the horizontal tail tube (A) into the hole in the rear of the fuselage.
2. Install the 2 piece (left and right) horizontal tail as shown. Ensure the con-
trol horn faces down.
3. Install 2 screws (B) to secure the horizontal tail into place.
4. Attach the clevis to the elevator control horn (see instructions for clevis
connection).
5. When needed, disassemble in reverse order.
A
B
3mm X 10mm
Prefl ight
1 Remove and inspect contents.
2 Read this instruction manual thoroughly.
3 Charge fl ight battery.
4 Fully assemble airplane.
5 Install the fl ight battery in the aircraft (once it has been fully charged).
6 Check the Center of Gravity (CG).
7 Bind aircraft to your transmitter.
8 Make sure linkages move freely.
9 Perform the Control Direction Test with the transmitter.
10 Perform the AS3X Control Direction Test with the aircraft.
11 Adjust fl ight controls and transmitter.
12 Perform a radio system Range Test.
13 Find a safe open area to fl y.
14 Plan fl ight for fl ying fi eld conditions.
4
Zobrazit stránku 3
1 2 3 4 5 6 7 8 9 ... 16 17

Komentáře k této Příručce

Žádné komentáře